Balance-of-plant civil works for generation projects: platforms, foundations, hardstands, access roads and site water.
The Discipline
On a renewable energy project the generation equipment comes from the technology supplier. What is left is a civil engineering contract: platform earthworks over a large footprint, several hundred foundations built to tight tolerance, access roads that carry abnormal loads, cable trenching, hardstands and the water infrastructure that keeps the site operating.
That is the daily business of our civils and water teams. Mass earthworks, heavy foundations, haul and access roads, hardstands, trenching and reservoirs are what Unicon has been building since 1991, and they are the same operations a balance-of-plant package is assembled from.
Scope Of Works
This is the balance-of-plant scope we are equipped and graded to carry out.
Track Record
Balance-of-plant work is earthworks, foundations, access roads and site water. These are comparable civil contracts from our project database, drawn from the heavy civils and earthworks side of the portfolio.
9
Projects delivered
2003–2015
Years active
3
Client organisations
24 months
Longest contract
| Year | Project | Client | Value |
|---|---|---|---|
| 2015 | Ntwasahlobo Bridge P-127 | KZN Department Of Transport | R5–20M |
| 2014 | Mkomazi River Bridge | KZN Department Of Transport | R5–20M |
| 2014 | Makhathini Drainage Canal near Jozini | Ezemvelo KZN Wildlife | R20–50M |
| 2013 | Mlazi Pedestrian Bridge | KZN Department Of Transport | Under R5M |
| 2013 | Inanda Road Services Relocation | KZN Department Of Transport | Under R5M |
| 2013 | Inanda Road Bridge Widening | KZN Department Of Transport | R5–20M |
| 2013 | Nzinga River Bridge P-127 | KZN Department Of Transport | R5–20M |
| 2004 | Kokstad RTI lot | Bernard Keal | Under R5M |
| 2003 | uMzimkhulu Bridge | KZN Department Of Transport | Under R5M |
Who We Build For
Method
Foundation quantities on a generation site are driven by ground conditions across a large footprint. The geotechnical picture is verified before the foundation method is fixed.
Several hundred near-identical foundations is a production problem. The gain is in the jig, the sequence and the survey control, not in working faster.
Access roads and hardstands are built early, to carry the heaviest delivery on the project, because everything else depends on them.
Tolerances, setting-out and handover of foundations are agreed with the equipment supplier in writing before the first pour.
Local labour and enterprise obligations are met with real packages and real support on site, the way we already work on municipal contracts.
Capacity
We self-perform the work that carries the risk and subcontract the rest to an approved vendor list. What follows is the plant and capability this discipline draws on.
Contracting
Counts below are across the whole portfolio and come from the same database as the project record above.
Appointment Type
Contract Form
CIDB 7CE and 7GB. B-BBEE Level 2 contributor. Work is measured and constructed to the SANS 1200 and SANS 2001 series, with building work to SANS 10400.
Send us the scope, the geotechnical report and the site constraints, and we will price the civil package.