Complete portfolio // 1991 – 2026

Built to
Outlast.

Every project Unicon has delivered since 1991 — 92 of them. Post-tensioned reservoirs holding megalitres without a drop lost, provincial bridges over live rivers, water schemes that reached communities who had none. Start with the flagships, then search the full record.

92

Projects Delivered

35

Years Executing

R1.5B+

Delivered Value

CIDB 7CE

National Grading

Signature Works

Flagship Projects.

8 projects that define what Unicon builds — chosen for engineering difficulty, scale, and the calibre of the clients who trusted us with them.

Concrete pour for the reedbed wastewater treatment works at Club Med Tinley Manor, Ballito
Flagship 2024
Wastewater

Tinley Manor WWTW (Club Med Resort)

Construction of proposed new Wastewater Treatment Works for the Club Med Hotel development

New WWTW for the Club Med resort development

Employer
Tinley Leisure (Pty) Ltd
Consultant
Nozaic & Westwood Consulting (Pty) Ltd
Contract scale
R5–20M
Duration
5 months
Structural steel frame rising over groundworks
Flagship 2023
Commercial & Retail

Howick Main Retail Centre

Howick on Main Shopping Centre (June 2023 to Present) consisting of 7600 sqm of retail with anchor tenants being Checkers, Dischem, Ocean Basket, Spur, Mug n Bean and Mr Price with the design from Visi Architects

7,600 m² retail GLA · Checkers, Dischem, Mr Price · 17 months

Employer
P Watcher (Pty) Ltd
Consultant
AP Projects
Contract scale
R50M+
Duration
17 months
Crane lifting a large industrial vessel into position
Flagship 2017
Industrial & Agri-Processing

Mnqumashe High Throughput Abattoir

Demolish existing building, cut to fill platforms and construct a new facility in portal frame steel structures, install all services and mechanical equipment.

Cut-to-fill platforms · Portal-frame steel · Full mechanical install

Employer
Eastern Cape Department of Rural Land Development
Consultant
LDM Quantity Surveying
Contract scale
R50M+
Duration
29 months
Workers erecting a roof structure on scaffolding
Flagship 2016
Education

Mangosuthu University — Student Centre

Construction of the new Student Centre at the University at Umlazi Durban.

New student centre, Umlazi campus · Delivered in 10 months

Employer
Mangosuthu University
Consultant
LDM Quantity Surveying
Contract scale
R20–50M
Duration
10 months
Xypex crystalline waterproofing with capped reinforcing steel
Flagship 2016
Bulk Water

Thabazimbi 10ML Reservoir with Dome Roof

Reinforced concrete reservoir, post-tensioned walls with dome roof without column supports. Includes in connecting pipework and chambers.

10ML · Post-tensioned walls · Dome roof with no column supports

Employer
Anglo American
Consultant
Tusk Construction Support Services
Contract scale
R5–20M
Duration
23 months
Bridge deck pour in the Drakensberg
Flagship 2014
Bridges & Heavy Civils

Makhathini Drainage Canal

Excavation and lining of the 4km concrete canal for the drainage of farmland on the Mjindi Plantations near Jozini.

4 km concrete-lined canal · Mjindi Plantations farmland drainage

Employer
Ezemvelo KZN Wildlife
Consultant
Contract scale
R20–50M
Duration
24 months
Tower crane and scaffolding over the Invesco Centre construction site, Pietermaritzburg
Flagship 2008
Commercial & Retail

Invesco Shopping Mall – PMB

New 3 story building retail centre with an approximate floor area of 17000m². Consists of basement parking, ground floor shop space and first-floor office/restaurant space. Unicon constructed all concrete structure works and undertook the contract in a joint venture with Carlos Da Costa Building.

17,000 m² over 3 storeys · Basement parking · All concrete structure

Employer
Invesco (Pty) Ltd
Consultant
Contract scale
R20–50M
Duration
20 months
Pivot irrigation system on farmland
Flagship 2008
Industrial & Agri-Processing

Nestlé Coffee Factory Expansion

Demolish existing and construct a new parking lot, new switch control rooms, extend tin can manufacturing room, build evaporator building, new waste storage tanks, cooling tower tanks, create new terraces and external works, all associated pipework Inc. 900 NB stormwater pipes and large retention tanks. Work Inc. other upgrades, extensions and restorations.

Evaporator building · Cooling towers · 900 NB stormwater

Employer
Nestle SA (Pty) Ltd
Consultant
Pollock William James & Partners
Contract scale
R20–50M
Duration
24 months

1993 // Msinga Top, KwaZulu-Natal

A school opened by Nelson Mandela.

Two years into trading, Unicon built the classroom blocks and hall at Mawele High School in deep rural Msinga. The completed school was officially opened by President Nelson Mandela.

Our first years were spent on clinics, hospitals and schools for communities that had none — then on the reservoirs and water schemes that now make up the largest part of this portfolio. That order of priorities has not changed.

Read our full history

The Full Record

Master Database.

All 92 completed and in-progress projects. Filter by discipline, decade or contract scale — or search across clients, consultants, materials and scope.

Discipline

Decade

Contract scale

Showing 92 of 92 projects

Concrete poured into pillar formwork
2026
Healthcare Complete

Hilton Veterinary Clinic — MRI Suite

Upgrade to x-ray room and clinic for Martin DeScally at his Hilton Veterinary practice design by Allan Potter & Assoc Architect

Employer
Private client
Consultant
Alan Potter & Ass.
Scale
Under R5M
Geocell retaining wall with aggregate fill
2026
Residential & Estate In progress

House Rencken — Renovations & Alterations

Renovations to 5 Chalet Drive Hilton, new ceilings decorations and flooring

Employer
Rolf Rencken
Consultant
Unicon KwaZulu-Natal
Scale
Under R5M
Telehandler positioning steel structure
2026
Commercial & Retail In progress

Merrivale Shell — Howzit Howick Fuel Station

Full replacement fuel station forecourts and convience store of 600m2 and 200m2 drive-through

Employer
HH Prop (Pty) Ltd
Consultant
Unicon KwaZulu-Natal
Scale
R20–50M
Brickwork and building materials on site
2025
Residential & Estate Complete

Avenue Residential Estate - Phase 3

Hi-spec residential unit on the Avenues estate in Hilton for JT Property group designed by Axiom Architechture

Employer
JTR Ross Property (Pty) Ltd
Consultant
Skyline Projects
Scale
R5–20M
Concrete pour for the reedbed wastewater treatment works at Club Med Tinley Manor, Ballito
Flagship 2024
Wastewater In progress

Tinley Manor WWTW (Club Med Resort)

Construction of proposed new Wastewater Treatment Works for the Club Med Hotel development

Employer
Tinley Leisure (Pty) Ltd
Consultant
Nozaic & Westwood Consulting (Pty) Ltd
Scale
R5–20M
Concrete pour into pillar formwork
2023
Residential & Estate Complete

07 Walter Road - Renovation

High-spec residential renovation in Hilton (Feb 2023 to Dec 2023), finishes to exceptional standard throughout.

Employer
Private client
Consultant
Design Workshop
Scale
Under R5M
Structural steel frame rising over groundworks
Flagship 2023
Commercial & Retail In progress

Howick Main Retail Centre

Howick on Main Shopping Centre (June 2023 to Present) consisting of 7600 sqm of retail with anchor tenants being Checkers, Dischem, Ocean Basket, Spur, Mug n Bean and Mr Price with the design from Visi Architects

Employer
P Watcher (Pty) Ltd
Consultant
AP Projects
Scale
R50M+
Tower crane and scaffolding over a retail centre build
2022
Commercial & Retail Complete

Astron Fuel Station Hilton

Aston Energy Fuel Station in Hilton (June 2023 to Present) comprising of a 304 sqm shop and 1500 sqm forecourt area

Employer
Mageza Fuels cc.
Consultant
Skyline Projects
Scale
R5–20M
Geocell retaining wall with aggregate fill
2022
Residential & Estate Complete

Avenue Residential Estate - Five Units

Med-spec residential unit on the Avenues estate in Hilton (June 2022 to April 2023) for JT Property group designed by Craft Of Architect

Employer
JTR Ross Property (Pty) Ltd
Consultant
Skyline Projects
Scale
R5–20M
Brickwork and materials on a current building site
2022
Healthcare Complete

Hilton Veterinary Clinic — CT Suite

Upgrade to x-ray room and clinic for Martin DeScally at his Hilton Veterinary practice design by Allan Potter & Assoc Architect

Employer
Private client
Consultant
Alan Potter & Ass.
Scale
Under R5M
Steel formwork and structural steelwork
2022
Commercial & Retail Complete

House Bishop - Renovation & Additions

High-spec additions and renovations for House Bishop (Oct 2022 to Mar 2023) in the up-market Hilton Gates estate comprising of changes to the buildings floor plan, new pool patio, pool, and synthetic decking. Building design by La…

Employer
Private client
Consultant
Larraine Steer
Scale
Under R5M
Workers finishing a concrete slab on formwork
2022
Residential & Estate Complete

House DeScally - New Residents

High-spec build on House Martin DeScally (Oct 2022 to Dec 2023) in the Monteverde Farm Estate in Hilton with a floor area of 565 sqm, includes a noteworthy 25m lap pool constructed above ground from Reinforce Concrete with design …

Employer
Private client
Consultant
Alan Potter & Ass.
Scale
R5–20M
Concrete foundation and excavation works
2022
Healthcare Complete

Payn Street Medical Suite

Structural concrete work and wet trades for a medical suite (Mar 2022 to Jun 2023) in a three-story building adjacent to a Medi-clinic hospital at 50 Payne Street Pietermaritzburg, value R8m

Employer
Private client
Scale
R5–20M
Telehandler positioning steel structure
2022
Commercial & Retail Complete

Woolworths Newcastle Fitout at Amajuba Mall

Full store fit out on behalf of the mall owners Cen prop for Woolworth Food being 1430sqm (June 2022 to Nov 2022) in Newcastle KwaZulu-Natal managing all trades to WW Specifications and design by R&L Architects

Employer
Cenprop (Pty) Ltd
Consultant
Skyline Projects
Scale
R5–20M
Structural steel frame rising over groundworks
2021
Commercial & Retail Complete

Coffee Berry Restaurant

Coffeeberry Restaurant fit with Interior Architects Nova Designs

Employer
M Malherbe (Pty) Ltd
Consultant
Nova Designs
Scale
Under R5M
Concrete pour into pillar formwork
2021
Residential & Estate Complete

Drummond Farm - Driveway Upgrades

Access to house, concrete strip road

Employer
Dargle Poles
Consultant
Unicon Construction Designed
Scale
Under R5M
Geocell retaining wall with aggregate fill
2021
Residential & Estate Complete

Endebeni Farm - Driveway Upgrades

Earthworks & concrete driveway to main farm house

Employer
Endebeni Farm
Consultant
Unicon Construction Designed
Scale
Under R5M
Workers finishing a concrete slab on formwork
2021
Residential & Estate Complete

House Thomas - Pool & Patio Upgrades

Upgrades to swimming pool and deck inclusive of design and construction

Employer
Private client
Consultant
Unicon Construction Designed
Scale
Under R5M
Brickwork and building materials on site
2021
Residential & Estate Complete

Sneeze Wood Farm - Renovations of Farm House

Paved entertainment area at main house

Employer
Sneezewood Farm
Consultant
Unicon Construction Designed
Scale
Under R5M
Brickwork and building materials on site
2021
Residential & Estate Complete

Woodcroft Cottage — Additions & Renovations

Additions to existing thatched buildings

Employer
Le Cordeur
Consultant
Unicon Construction Designed
Scale
Under R5M
Workers finishing a concrete slab on formwork
2019
Residential & Estate Complete

Zimbane Housing Scheme, Mtata, Eastern Cape

RDP Housing Scheme (200 Units)

Employer
Umtata City
Consultant
Nebavest 46 (Pty) Ltd
Scale
R20–50M
Pipeline installation with excavator and crane
2018
Bulk Water Complete

Mandlakazi Phase 5.1 Bulk Water Supply

Construction of 9km to 11km bulk gravity mains and reservoirs.

Employer
Zululand District Municipality
Consultant
MSW Consulting
Scale
R5–20M
Crane lifting a large industrial vessel into position
Flagship 2017
Industrial & Agri-Processing Complete

Mnqumashe High Throughput Abattoir

Demolish existing building, cut to fill platforms and construct a new facility in portal frame steel structures, install all services and mechanical equipment.

Employer
Eastern Cape Department of Rural Land Development
Consultant
LDM Quantity Surveying
Scale
R50M+
Workers erecting a roof structure on scaffolding
Flagship 2016
Education Complete

Mangosuthu University — Student Centre

Construction of the new Student Centre at the University at Umlazi Durban.

Employer
Mangosuthu University
Consultant
LDM Quantity Surveying
Scale
R20–50M
Steel reinforcement laid ahead of a concrete pour
2016
Education Complete

Phagindawo Junior School, Cato Ridge

The completion contract consisting of New Media Centre, Admin Block, Toilet Blocks, SNP kitchen unit, Grade R Block, Site works,

Employer
Coega Development Agency
Consultant
Coega Development Agency
Scale
R5–20M
Xypex crystalline waterproofing with capped reinforcing steel
Flagship 2016
Bulk Water Complete

Thabazimbi 10ML Reservoir with Dome Roof

Reinforced concrete reservoir, post-tensioned walls with dome roof without column supports. Includes in connecting pipework and chambers.

Employer
Anglo American
Consultant
Tusk Construction Support Services
Scale
R5–20M
Clariflocculator reinforcement and concrete structure at Bhobhoyi, Port Shepstone
2015
Bulk Water Complete

Bhobhoyi Water Treatment Upgrade

The completion contract for the upgrade contract at the Bhobhoyi Port Shepstone. Construction of Clariflocculator, Pump Station, chambers and aux structures.

Employer
UGU District Municipality
Consultant
Royal Haskoning DHV
Scale
R5–20M
Crane lifting a precast concrete bridge beam
2015
Bridges & Heavy Civils Complete

Ntwasahlobo Bridge P-127

Construction of a Provincial Road Bridge over River along the Lower Loteni Road (P127) from Impendle to Himeville

Employer
KZN Department of Transport
Consultant
DE Consulting
Scale
R5–20M
Steel reinforcement for the clearwater reservoir at Kearsney College
2014
Wastewater Complete

Kearsney College WTW Upgrade

Renovation and Upgrades to the existing Kearsney College Wastewater Treatment Works. Including the Variation Order for the construction of a new reinforced clear water reservoir.

Employer
Kearsney College
Consultant
Hatch Consulting Con. Eng.
Scale
Under R5M
Concrete reservoir under construction
2014
Bulk Water Complete

Lower Tugela Secondary Bulk Water Supply Scheme

Construction of a 5ML Reservoir at the Sans Souci Reservoir Site on the North Coast.

Employer
Umgeni Water Board
Consultant
Black Balance Projects
Scale
R5–20M
Geomembrane and bidum layers in reedbed wastewater cells
2014
Wastewater Complete

Lynnfield WWTW upgrades

Upgrades to the existing WWTW via the addition of new inlet, dewatering, aeration tanks.

Employer
Umgeni Water Board/Msunduzi Local Municipality
Consultant
Hatch Consulting Con. Eng.
Scale
R5–20M
Bridge deck pour in the Drakensberg
Flagship 2014
Bridges & Heavy Civils Complete

Makhathini Drainage Canal

Excavation and lining of the 4km concrete canal for the drainage of farmland on the Mjindi Plantations near Jozini.

Employer
Ezemvelo KZN Wildlife
Scale
R20–50M
Geomembrane liner installation at sunset
2014
Bulk Water Complete

Mason 10Meg Reservoir & Pipeline

Construction of 10 Mega-litre concrete reinforced post-tensioned reservoir with dome roof structure, associated bulk pipeline 300 Dia PVC, Road works, and Building works.

Employer
Msunduzi Local Municipality
Consultant
Bigen Africa Services (Pty) Ltd
Scale
R20–50M
Road bridge spanning the Umkomazi river amid rolling hills
2014
Bridges & Heavy Civils Complete

Mkomazi River Bridge

Construction of a Provincial Road Bridge over the Mkomazi River along the Lower Loteni Road (P127) from Impendle KZN.

Employer
KZN Department of Transport
Consultant
DE Consulting
Scale
R5–20M
Scaffolding around a circular concrete reservoir wall
2013
Bulk Water Complete

EEM CWWS Phase 5

Construction of No.5 reinforced concrete reservoirs, 2 km pipeline and upgrades to treatment & Abstraction works on the Nzinga River near Impendle KZN. Project includes Electrical & Mechanical works, New raw water pumps, grit remo…

Employer
uMgungundlovu District Municipality
Consultant
Sukuma Consulting Engineers (PTY) LTD
Scale
R5–20M
Excavator shaping a canal through red soil
2013
Bridges & Heavy Civils Complete

Inanda Road Bridge Widening

Bridge over railway line for the widening of Inanda Road leading from Hillcrest to Waterfall KZN

Employer
KZN Department of Transport
Consultant
VNA Const. Eng.
Scale
R5–20M
Bridge beam installation by crane
2013
Bridges & Heavy Civils Complete

Inanda Road Services Relocation

Relocation of ground services including 500mm Dia Steel water mains and Erf. Connection for 8km on Inanda Road leading from Hillcrest to Waterfall KZN

Employer
KZN Department of Transport
Consultant
VNA Const. Eng.
Scale
Under R5M
Rail overpass bridge under construction
2013
Bridges & Heavy Civils Complete

Mlazi Pedestrian Bridge

Construction of a new 72m Pedestrian Bridge over the Umlazi river near Hammarsdale KZN.

Employer
KZN Department of Transport
Consultant
DE Consulting
Scale
Under R5M
Aerial view of bulk excavation and earthmoving
2013
Bridges & Heavy Civils Complete

Nzinga River Bridge P-127

Construction of a Provincial Road Bridge over the Nzinga River along the Lower Loteni Road (P127) from Impendle KZN.

Employer
KZN Department of Transport
Consultant
DE Consulting
Scale
R5–20M
Agricultural terracing earthworks from the air
2013
Industrial & Agri-Processing Complete

Sankontshe 1ML Concrete Reservoir

Construction of one 1Meg concrete reservoir and associated steel pipework located at Sankontshe near Cato Ridge KZN.

Employer
Durban Metro, Water & Sanitation
Consultant
UWP Consulting Engineers
Scale
Under R5M
Aerial view of reservoir lining and roof works
2013
Bulk Water Complete

Stanger Road 2.5 Meg

Construction of one 2.5 Megalitre Concrete Reservoir and associated pipework along Durban road outside Greytown KZN.

Employer
uMzinyathi District Municipality
Consultant
Royal Haskoning DHV
Scale
R5–20M
Irrigation equipment framework in the field
2012
Industrial & Agri-Processing Complete

Bayonne Dairy Farm

Complete construction of milking dairy to suite 500 cattle. Located near Mooi River KZN. Include the construction of dams, silage pits and pump station for irrigation.

Employer
Agri Development Agency (ADA)
Scale
Under R5M
Reinforced concrete dome roof on a circular water reservoir
2012
Bulk Water Complete

Ethembeni Water Treatment Works

Construction of 3Meg concrete reservoir, two 100kl concrete tanks, a pump station with attendance house and full Mechanical and Electrical installation of 2 pumps with controls.

Employer
uMzinyathi District Municipality
Consultant
ILIFA Africa Engineers
Scale
R5–20M
Scaffolding around concrete columns
2012
Education Complete

Isiphosemvelo Secondary School

Construction of 12 new structures, inclusive of laboratories, media & computer rooms, VIP toilets, Kitchens, new external works and more. Includes full Electrical Installation

Employer
Coega Development Corporation
Consultant
Aecom (Pty) Ltd
Scale
R5–20M
Concrete clarifier structure at a treatment plant
2012
Wastewater Complete

Lincoln Meade Sewer PS

New 600KL Concrete Sump and top structure pump station, with standby Generator. Inc. 3km 315 uPVC Rising Main & 1.1km Gravity pipelines. The project includes all electrical and mechanical works for the installation of 6x Pump-sets…

Employer
Msunduzi Local Municipality
Consultant
EVN Consulting Engineers
Scale
R5–20M
Reservoir dome reinforcement ahead of a concrete pour
2012
Bulk Water Complete

Makhabeleni Ph6A Structures

Construction of 5x 250KL, one 1000KL concrete reservoirs, 4x pump stations with new access roads and associated pipework and valves. Project includes all electrical and mechanical works for the installation of 12x Vertical Pump wi…

Employer
uMzinyathi District Municipality
Consultant
MSW Consulting Engineers
Scale
R5–20M
Pipeline installation with excavator and crane
2012
Bulk Water Complete

Ngcobo 200kl Concrete Reservoir

Construction of one 200kl concrete reservoir located at the Ngcobo area of KZN

Employer
UGU District Municipality
Consultant
Royal Haskoning DHV
Scale
Under R5M
Geomembrane liner across a containment basin
2012
Wastewater Complete

Shorts Retreat Factory: Eco-Cycle Medical Waste Management Facility

Construction of factory building and associated external works at Shorts Retreat in the Pietermaritzburg are.

Employer
Sirela Trading cc.
Scale
Under R5M
Xypex crystalline waterproofing with capped reinforcing steel
2011
Bulk Water Complete

Umgeni Water 61 Pipeline Augmentation

Construction of concrete chambers along the 61 Pipeline,

Employer
Umgeni Water Board
Scale
Under R5M
Geomembrane liner installation at sunset
2010
Bulk Water Complete

Makhabeleni WTW – Upgrades

New Abstraction Pipework, Pre-Settling tank, Floc Mix Channel, 2x Clarifiers, 4x Rapid Gravity sand filters, 500kl Clear Water Reservoir & new High lift Pump Station

Employer
uMzinyathi District Municipality
Consultant
MSW Consulting Engineers
Scale
R5–20M
Geomembrane and bidum layers in reedbed wastewater cells
2009
Wastewater Complete

SAFAL STEEL Cato Ridge

Cooling towers, Effluent TP, Sewer TP, Machine Bases

Employer
Safal Steel
Consultant
Safal Steel
Scale
R5–20M
Concrete reservoir under construction
2009
Bulk Water Complete

uMzimkhulu storage dam - NPS

Construction of 31m Tall concrete off Taking tower, pier & Abutment, as well as the Encasement of 900NB off, take Pipeline for the uMzimkhulu Storage dam in the Port Shepstone area on the KZN South Coast.

Employer
UGU District Municipality
Scale
Under R5M
Aerial view of reservoir lining and roof works
2008
Bulk Water Complete

Dududu Reservoirs - KZN south coast

Construction of two one megalitre concrete Reservoirs in the Dududu area of KZN South Coast

Employer
UGU District Municipality
Consultant
CBI Consulting Engineers
Scale
R5–20M
Tower crane and scaffolding over the Invesco Centre construction site, Pietermaritzburg
Flagship 2008
Commercial & Retail Complete

Invesco Shopping Mall – PMB

New 3 story building retail centre with an approximate floor area of 17000m². Consists of basement parking, ground floor shop space and first-floor office/restaurant space. Unicon constructed all concrete structure works and under…

Employer
Invesco (Pty) Ltd
Scale
R20–50M
Pipeline installation with excavator and crane
2008
Bulk Water Complete

Kloof filter beds

Replacing of Monolithic floors, filter nozzles and sand

Employer
Kokstad Local Municipality
Scale
Under R5M
Pivot irrigation system on farmland
Flagship 2008
Industrial & Agri-Processing Complete

Nestlé Coffee Factory Expansion

Demolish existing and construct a new parking lot, new switch control rooms, extend tin can manufacturing room, build evaporator building, new waste storage tanks, cooling tower tanks, create new terraces and external works, all a…

Employer
Nestle SA (Pty) Ltd
Consultant
Pollock William James & Partners
Scale
R20–50M
Reinforced concrete dome roof on a circular water reservoir
2008
Bulk Water Complete

Slangspruit Reservoir – PMB

Completion of 4.6 Mega LTR concrete Reservoir and all associated pipework, in the Imbali section 14 (Slangspruit) Pietermaritzburg KZN.

Employer
Msunduzi Municipality
Consultant
Consultant: Liebenberg & Jenkins
Scale
Under R5M
Scaffolding around a circular concrete reservoir wall
2008
Bulk Water Complete

St Helen's Rock abstraction works

Construction of two new Retractable low lift Pump station and winch houses running at a 35º slope for 45m into uMzimkulu river. Construction of large grit removal channels and screen as well as installation and upgrade of new high…

Employer
UGU District Municipality
Consultant
SSI Consulting
Scale
R5–20M
Reservoir dome reinforcement ahead of a concrete pour
2007
Bulk Water Complete

Embusweni Reservoir

300 ltr reinforced concrete reservoir in the Greytown area of central KZN.

Employer
Scale
Under R5M
Geomembrane liner installation at sunset
2006
Bulk Water Complete

Isibani Reservoir

500 Kl Reinforced concrete Reservoir

Employer
UGU District Municipality
Scale
Under R5M
Xypex crystalline waterproofing with capped reinforcing steel
2006
Bulk Water Complete

Kokstad Storage Reservoir

Five mega ltr reinforced concrete Reservoir

Employer
Kokstad Local Municipality
Scale
R5–20M
Concrete reservoir under construction
2006
Bulk Water Complete

Mtwalume WTW

8 Clarifiers & 400kl concrete Reservoir

Employer
UGU District Municipality
Scale
Under R5M
Tower crane and scaffolding over a retail centre build
2005
Commercial & Retail Complete

Dynarc Mall - Scottburgh

Extensions, Alterations & Restorations

Employer
Dynarc Investments
Scale
R50M+
Scaffolding around a circular concrete reservoir wall
2005
Bulk Water Complete

Howick Filter

Reinforced concrete filter unit

Employer
Umgeni Water Board
Scale
Under R5M
Aerial view of reservoir lining and roof works
2005
Bulk Water Complete

Kokstad filter beds

Replacing of Monolithic floors

Employer
Kokstad Local Municipality
Scale
Under R5M
Dairy cattle grazing in a misty pasture
2004
Industrial & Agri-Processing Complete

Hazeldene Saw Mill - Chip Board Line

infrastructure for chipboard plant

Employer
Hazeldene Saw Mill
Scale
Under R5M
Reservoir dome reinforcement ahead of a concrete pour
2004
Bulk Water Complete

Isibani Water Scheme

500 Kl concrete Reservoir & Pump Station

Employer
UGU District Municipality
Scale
Under R5M
Bridge deck pour in the Drakensberg
2004
Bridges & Heavy Civils Complete

Kokstad RTI lot

Eight 700m² Concrete slab

Employer
Bernard Keal
Scale
Under R5M
Aerial view of reservoir lining and roof works
2004
Bulk Water Complete

Makhabeleni PH 1B

50 Kl concrete reservoir

Employer
uThukela Water Boards
Scale
Under R5M
Pipeline installation with excavator and crane
2004
Bulk Water Complete

Makhabeleni PH 4

200 Kl concrete Reservoir

Employer
uThukela Water Board
Scale
Under R5M
Reinforced concrete dome roof on a circular water reservoir
2004
Bulk Water Complete

Middle Drift Reservoir

500 Kl concrete Reservoir

Employer
Umgeni Water Board
Scale
Under R5M
Geomembrane liner across a containment basin
2004
Wastewater Complete

Pennington sewer treatment works

Three cone Clarifiers, inlet, aeration dam, more

Employer
UGU District Municipality
Scale
R5–20M
Scaffolding around a circular concrete reservoir wall
2003
Bulk Water Complete

Makhabeleni PH 2B

50 Kl Reservoir , 32km Reticulation & 48 Standpipes

Employer
uThukela Water Boards
Scale
Under R5M
Reservoir dome reinforcement ahead of a concrete pour
2003
Bulk Water Complete

Makhabeleni PH1 water scheme

Abstraction works, treatment & storage

Employer
uThukela Water Boards
Scale
Under R5M
Reinforced concrete dome roof on a circular water reservoir
2003
Bulk Water Complete

Ndelu WTW

Abstraction works, treatment & storage

Employer
UGU District Municipality
Scale
Under R5M
Crane lifting a large industrial vessel into position
2003
Industrial & Agri-Processing Complete

Nestle Milk Depot

Alterations & Extensions

Employer
Nestle SA (Pty) Ltd
Scale
Under R5M
Concrete reservoir under construction
2003
Bulk Water Complete

Umbumbulu water scheme

2 of 500 Kl concrete reservoirs

Employer
Durban Metro, Water & Sanitation
Scale
Under R5M
Crane lifting a precast concrete bridge beam
2003
Bridges & Heavy Civils Complete

uMzimkhulu Bridge

Bridge Abutments

Employer
KZN Department of Transport
Scale
Under R5M
Xypex crystalline waterproofing with capped reinforcing steel
2002
Bulk Water Complete

Kwa-eye Water scheme

500 Kl concrete Reservoir & 3 5 Kl BPT

Employer
UGU District Municipality
Scale
Under R5M
Geomembrane liner installation at sunset
2002
Bulk Water Complete

Niavini water Scheme

200 Kl reservoir & Pump Station

Employer
UGU District Municipality
Scale
Under R5M
Pipeline installation with excavator and crane
2001
Bulk Water Complete

Louisiana Water Storage

500 Kl concrete reservoir

Employer
UGU District Municipality
Scale
Under R5M
Xypex crystalline waterproofing with capped reinforcing steel
2001
Bulk Water Complete

Njengabantu water scheme

250-litre Reservoir, borehole, mains & retic

Employer
uThukela Water Boards
Scale
Under R5M
Geomembrane liner installation at sunset
2000
Bulk Water Complete

Mkuze waterworks

2 of 1 Ml concrete reservoirs

Employer
Mkuze Local Municipality
Scale
Under R5M
Scaffolding around a circular concrete reservoir wall
1999
Bulk Water Complete

Bizana water scheme

6 of 250 Kl concrete reservoirs

Employer
Eastern Cape Department of Water & Sanitation
Scale
Under R5M
Concrete reservoir under construction
1999
Bulk Water Complete

Umbuba water scheme

500 Kl concrete reservoir

Employer
Eastern Cape Department of Water & Sanitation
Scale
Under R5M
Aerial view of reservoir lining and roof works
1998
Bulk Water Complete

Mt Frere water scheme

1 of 1 Ml Reservoir, 1 of 500 Kl Reservoir

Employer
UGU District Municipality
Scale
Under R5M
Reservoir dome reinforcement ahead of a concrete pour
1997
Bulk Water Complete

Vulamhulu water scheme

12 of 250 - 500 Kl Reservoir & 18 5 Kl BPT's

Employer
UGU District Municipality
Scale
Under R5M
Reinforced concrete dome roof on a circular water reservoir
1995
Bulk Water Complete

Ethembeni water scheme

Abstraction, treatment, storage, retic

Employer
Umgeni Water Board
Scale
Under R5M
Concrete clarifier structure at a treatment plant
1994
Wastewater Complete

Centacow sewerage treatment

Inlet, aeration, ponds, etc...

Employer
KZN Public Works
Scale
Under R5M
Workers erecting a roof structure on scaffolding
1993
Education Complete

Mawele High School, Msinga Top

Construction of new classroom blocks, hall and renovation of existing buildings. Opening by President Nelson Mandela

Employer
KZN Public Works
Scale
Under R5M
Concrete poured into pillar formwork
1992
Healthcare Complete

Creighton Hospital

Construction of new buildings, renovation of existing buildings and upgrades to roads and fencing

Employer
KZN Public Works
Scale
Under R5M
Brickwork and materials on a current building site
1991
Healthcare Complete

Tugela Ferries Clinic

Construction of new Clinic buildings

Employer
KZN Public Works
Scale
Under R5M

Where the Work Sits

Bulk water and wastewater make up the core of the portfolio — the disciplines where zero-leakage tolerances leave no margin for error.

41

Bulk Water

8

Wastewater

9

Bridges & Heavy Civils

8

Commercial & Retail

6

Industrial & Agri-Processing

4

Education

5

Healthcare

11

Residential & Estate

Repeat Clients

UGU District Municipality (15), Private client (7), KZN Department of Transport (7), Umgeni Water Board (5), uMzinyathi District Municipality (4), uThukela Water Boards (4) — measured by number of separate contracts awarded.

Contract Formats

Delivered under GCC 1990, 2004, 2010 and 2015, and JBCC Series 3 through 6.2 — as full contracts, construction management and turnkey appointments.

Applied Materials

Post-tensioned concrete cables, XYPEX crystalline waterproofing, geomembrane liners, high-density rebar, slip-form concrete and structural steel portal frames.

From the Sites

Dome pours, liner installations, deck pours and mass earthworks — photographed on our own sites.

Full photo gallery

Select any frame to enlarge

Browse by Decade

Tabulated archives for every era of the company.

Engage Our Engineering Team

For detailed BOQs, the full project schedule with contract values, or procurement auditing, start a technical enquiry — we respond with the engineer who would run your job.